The owners of this property were in much need of additional living space. Following consultations with an architect it was decided the best way to maximise their property was to construct a double storey extension. The lower ground floor space will be used for a new modern kitchen and open plan dining room creating much needed family space. The upper floor will be used for 2 new bedrooms one of which will have an ensuite bathroom.

JCJ Construction was approached to fully manage this project and carry out all the building works.

The project included:

  • Converting the loft space into 2 one bedroom apartments.
  • Construction of double storey extension.
  • New modern kitchen and open plan dining room area.
  • Creating additional utility room.
  • Creating 2 new bedrooms one with ensuite bathroom
  • Construction of retaining wall to match structural engineer specification.

Before

Hove Park - Double Storey House Extension Project Hove Park - Double Storey House Extension Project
Project Progress

26th Oct 2015

Groundworks - Construction of retaining wall

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1

18th Nov 2016

Construction of structural piers and retaining wall started. Brickwork up to DPC (ground level)

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1

25th Nov 2015

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1

7th Dec 2015

Construction of brick and block external walls up to first floor height & installation of structural steels

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1

27th Jan 2016

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1

14th Mar 2016

Installation of bathroom and kitchen started, painting & decorating complete.

Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1 Hove Park Double Storey Extension - Phase 1
  • From start to finish we could not fault them. Every stage was dealt with in a very professional manner, from the project management through to ALL the guys on site they were a pleasure to deal with...

    Aideen & Karen

  • We were really impressed by how proactive JCJ were throughout the build, they communicated with us regularly and helped with all the project management...

    Adrian & Maria

  • We are most grateful to JCJ for carrying out an excellent job of work on time. We have no hesitation whatsoever in recommending JCJ.

    Noel & Judy Fletcher

  • Most projects including ours, have a challenge or two along the way which need to be tackled correctly, without conflict, and with a can-do, prompt attitude – JCJ provided exactly that approach, and we look forward to working with them again in the near future...