JCJ Construction was brought in to create two single storey extensions. This additional living space is for a stunning new kitchen, dining room, utility room and playroom.

The project included:

  • Two single storey extensions with flat roofs.
  • New large open plan space for a kitchen, dining room, utility room and playroom.
  • Installed of steel beams to help create open space.
  • Underfloor heating throughout ground floor.
  • New wood floor throughout entire ground floor.
  • New external decking.
  • Complete new hot water and heating system.
House Extension,Hove, East Sussex House Extension,Hove, East Sussex House Extension,Hove, East Sussex
Project Progress

Before

St Leonards Before St Leonards Before St Leonards Before

1st June 2015

Enabling works, demolition of existing extension and strip out in progress.

St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1

10th June 2015

Enabling works. Installation of temporary props to hold the house up.

St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1 St Leonards phase 1

17th June 2015

Installation of permanent steels to support newly removed wall.

St Leonards phase 3 St Leonards phase 3 St Leonards phase 3

1st July 2015

Pitching the side flat roof with housings for roof lights and timber framed wall lining.

St Leonards phase 4 St Leonards phase 4 St Leonards phase 4 St Leonards phase 4 St Leonards phase 4 St Leonards phase 4

23rd July 2015

All structural steels installed. Roof finishing in progress.

St Leonards phase 5 St Leonards phase 5 St Leonards phase 5

5th August 2015

Brickwork complete, glass sliding doors installed and dry lining complete ready for plastering.

St Leonards phase 6 St Leonards phase 6 St Leonards phase 6 St Leonards phase 6 St Leonards phase 6 St Leonards phase 6

4th Sept 2015

St Leonards phase 6 St Leonards phase 6 St Leonards phase 6 St Leonards phase 6 St Leonards phase 6

23rd Sept 2015

St Leonards phase 5 St Leonards phase 5 St Leonards phase 5

We engaged the services of JCJ to build and renovate a ground floor extension. From start to finish we could not fault them. Every stage was dealt with in a very professional manner, from the project management through to ALL the guys on site they were a pleasure to deal with. Adam is great at making you (the client) feel at ease, and as with all builds, mishaps do happen, they insured that they are dealt with in an informed and reasonable manner. We now have a fantastic family living space to enjoy and should we ever want to take on another renovation project we would be more than happy to employ JCJ.

Aideen & Karen | September 2016

  • From start to finish we could not fault them. Every stage was dealt with in a very professional manner, from the project management through to ALL the guys on site they were a pleasure to deal with...

    Aideen & Karen

  • We were really impressed by how proactive JCJ were throughout the build, they communicated with us regularly and helped with all the project management...

    Adrian & Maria

  • We are most grateful to JCJ for carrying out an excellent job of work on time. We have no hesitation whatsoever in recommending JCJ.

    Noel & Judy Fletcher

  • Most projects including ours, have a challenge or two along the way which need to be tackled correctly, without conflict, and with a can-do, prompt attitude – JCJ provided exactly that approach, and we look forward to working with them again in the near future...

    Mr and Mrs Azimi

SEND US YOUR ENQUIRY